DF-5/DF-5A was replaced by DF-5B not DF-41. The mobile ICBM need be used in the second nuclear strike not first. DF-5 series DF-31 series and DF-41 series are different kinds in different positions of our nuclear power, they cannot be replaced by each other. Our nuclear power has been very...
HTGR's power density is too low, never suitable to be used as the source of power of nuclear sub, the volume of the power section would occupy the most volume of the sub. Even the construction of the first demonstration reactor of HTGR for electricity generation need be finished in 2017. To use...
What TanZuojun said more likely is the 095 that was got the formal approval of project officially 2012, it wont take too short time from the begin of project to the launch of the first sub. The 093B may have used some techs that will be used in 095.
China has the institution of the basic level election, which means every adult can choose the officials they like and express their displeasure to the officials of their local basic level government.