https://theprint.in/2018/01/05/the-desi-lca-is-defence-ministrys-low-hanging-fruit-and-it-needs-to-be-plucked-now/
The desi LCA is defence ministry’s low-hanging fruit and it needs to be plucked now
A quick turnaround of the Tejas light fighter is on the cards but the government needs to step...
What about the engine IAF purchase 20(IOC)+20(FOC)+83(MKA) Which mean all come with GE-F404.
What about 99 F414 engine which India already order in 2010.
it mean the total order: 123+99
http://www.news18.com/news/india/india-russia-talks-on-s-400-air-defence-system-at-profound-stage-contract-anytime-russian-official-1601377.html
India had announced in October last year a deal on the Triumf air defence systems from Russia, worth over $5 billion and collaborate in making four...
As a run-up to the FOC in 2018, LCA LSP-8 is optimising flight profiles with the in-flight refueling probe (IFR). Air-to-air refueling trials will begin early 2018. First dry contact followed by wet trials. So far, LSP-8 flew 44 sorties with IFR.