i think its better to stop this thread because no one can compare the capabilities of a plane that has not been tested yet the features of the planes are not yet known
pakisthan has ordered 4 saab Erieye airborne early warning (AEW) aircraft from Sweden out of which one is for training purpose remaining three will be for airforce use and 4 kj200 from china which will be delivered by 2012
the INS Vikramaditya will have a complete refit 70 per cent of the ship and its equipment will be new and remainder will have been refurbished and india is building 2more aircraft carriers which will be ready by 2020
by 2020 INDIAN NAVY will be
AIRCRAFT CARRIERS
1.INS Vikramaditya
2.vikrant...
LCA is not a third its 4.5 generation jet and even the j10 is fourt generation and j10B will be a 4.5 generation which is still in testing and lca mark 2 will be ready by 2012
MCA is a program to make a fifth generation plane to replace the jaguars and the working on the project has already be...
5 years is not enough to complete the entire testing and induction it may be possible of plaaf to induct the j10 B but to export these planes in 5 years will be very difficult because the engine will be russian engine because the ws-10a engine is not yet ready
one thing is sure in the future India will make its own planes because its has gained a vast experience by developing the LCA and pakisthan has depend on china or other countries for its fighters where as india will develops its own systems
this missile is still in development phase but during its tests it showed 100% accuracy the radar was jointly developed by India and Israel and the same used in arrow missile defense
yes they are but still to integrate it with the J10 will be a big task and the are new on the J10 platform so i don't think china will try to induct without testing the plane thoroughly and yes china hast nice record but still it will first induct the J10 b then only it will sell to Pakistan so...
any plane to become a complete fighter it should be thoroughly tested the systems of J10 b are new so it will take time for the plane to start production
the chinese plane is still in development phase and no one knows how many years it will take for the first test but india plane will be inducted in numbers by 2017
its difficult for pakisthan to get the kj 2000 because even china doesnt have IL 76 plances to place the radar so china has to develop its own plance or think of an alternative so it will take many years for pak to get a kj 2000 even if plans to buy one
the j 10 b is still in development phase and it may take some years to become a complete fighter so initial FC20 will be based on j 10 a and may be in future it will be j 10 b
with the development of LCA india has developed the fly-by-wire (FBW) flight control system (FCS), multi-mode pulse-doppler radar, and afterburning turbofan engine technologies
i dont know why many people take LCA as a failed project it has not been closed and still development is going on but the one major thing is INDIA has gained experience in designing and developing a fighet which we lacked when we started the LCA program .the experience gained from this project...
the chinese dont match the israil because us has not allowed it to sell their tech to china and one more prob is that china doesnt have enough IL76 planes to integrate its awacs and china has not placed any offers for new IL76
kj 200 is old awacs of china which pakistan is planning to buy...