buddy post all the things...Isnt this engine looks ugly:-)
Ice is hot !
Cryogenics is the study of production of extremely low temperatures (below minus 150 degree Celsius) and is by far the most efficient chemical propulsion technology known to mankind.
In line with this definition, Ice...
Six extended C band transponders of GSAT-14 will be all ears to facilitate the communication needs of the country. These transponders are loaded with 36 dBW 'Edge of coverage- Effective Isotropic Radiated Power' (EOC-EIRP)
Simply put, EIRP is the maximum output power of a transponder.
*In...
:-):cheesy::police::sick::lol:
Mission Status: GSLV-D5/GSAT-14
We are all set for the launch, the launch rehearsal has been successfully completed a few hours back, all results are apparently normal...
GSLV D5 : Vital stats
The 29-hour countdown for the GSLV D5 launch is expected to...
Integrating GSLV D5
The cynosure of all eyes, Indigenous Cryogenic stage photographed upon arrival at Vehicle Assembly building. The strap-on stages and the core stage of GSLV D5 are also seen.
*In this series we bring to you a quick recap of the step by step resurrection of GSLV D5 with the...
Integrating GSLV D5
The second stage of the GSLV burns about 40 tonnes of Liquid propellants (UH25 and Nitrogen tetroxide) for about 150 seconds to produce a maximum thrust of about 720 kN.
*In this series we bring to you a quick recap of the step by step resurrection of GSLV D5 with the...
Well If U know about DOR and also about Quasars, hats off sir;
I get search one post in Bharat Rakshak forum which is as under, may it will be useful, as in it its refer that any Quasar near 10 degree may be used for it.
Its as under
poster (prasannasimha) Bharat Rakshak • View topic -...
Picture of the day ! (28 December)
An electrifying view of the GSLV D5 at the vehicle assembly building, before movement to the launch pad.
Hold your breath !
That's how the GSLV D5 was moved towards the launch pad.
(29 Dec)
Grilling GSAT-14 !
Solar Panel deployment tests on...
Integrating GSLV D5
Joining of two segments to form the 20.1 m long first stage core motor comprising of five segments of 2.8 m diameter. This huge first stage itself accounts for 40% of the height of the 49.13 m tall GSLV D5.
*In this series we bring to you a quick recap of the step by step...
Integrating GSLV D5
Five segments are stacked one over the other to form the first stage solid propellant motor of GSLV D5. This motor smokes about 139 tonnes of Hydoxyl-terminated polybutadiene (HTPB) based propellant to produce a maximum... thrust of about 4800 kN in about 100 seconds.
*In...
Well go for new hele.
Sikorsky S-97 Raider - Wikipedia, the free encyclopedia
whichis based on the the Technology Demostrater Sikorsky X2 - Wikipedia, the free encyclopedia
Geosynchronous Satellite Launch Vehicle (GSLV D5) will be India’s attempt to flight-test its indigenously developed Cryogenic Engine and Stage.
This stage sips almost 13 tonnes of Liquid Hydrogen and Liquid Oxygen in just twelve minutes to produce a thrust of 75 kN.
Satellite integration with...
The Latest Updates of the ISRO.
Why we exist, what is our purpose ...
First launch attempt of GSLV-D5 in Aug, 2013 — in Sriharikota.
Mission Status: GSLV-D5/GSAT-14 Mission:
GSLV-D5 is all set to soar the skies off Sriharikota space-port. The launch is targeted on 1618 hrs of...
I think India and congress have spoiled the game unnecessarily, the act of India is directly challange to the US respect or Igo. Congress unnecessarily make hue and cry on issue, perhaps it would be possible to do fruitful act at backdoor without raising more shouting. US may ready to do proper...