Dec 05, 2018
India’s heaviest communication satellite GSAT-11 launched successfully from French Guiana
Indian Space Research Organisation’s (ISRO) heaviest and most-advanced high throughput communication satellite GSAT-11 was successfully launched from the Spaceport in French Guiana during the...
Dec 04, 2018
The countdown for the launch of GSAT-11 mission onboard Ariane-5 launch vehicle started today (December 04, 2018) at 13:14 Hrs IST from French Guiana. The launch is scheduled at 02:07 Hrs IST on December 05, 2018.
GSAT-11 Mission
GSAT-11 is the next generation high throughput communication satellite configured around ISRO’s I-6K Bus. Weighing about 5854 kg, GSAT-11 is the heaviest satellite built by ISRO. The satellite is scheduled for launch onboard Ariane-5 launch vehicle from French Guiana. The...
Dec 02, 2018
HysIS First day Image:
The 1st Day image from the Hyperspectral Imaging Satellite HysIS, was acquired at NRSC Hyderabad on 02 December 2018, covering parts of Lakhpat in Gujarat. The sample color composite image represents VNIR spectral bands.
My heritage and cultural link to Babur is negligible, if any. I don't really care that his mosque got demolished.
The mosque that my heritage is linked to predates Mughals by nearly 1000 years and stands strong.
But those who demolished Babri and calls for a Mandir are privileged central Asian...
Blk3 entered preliminary design stage only towards the end of last year, in Chengdu.
What do you expect from them? Are you gonna court martial those poor engineers? Even Chinese companies have limitations.
This aircraft isn't such a huge priority to Chengdu that they'd enter the design stage...
Nov 29, 2018
PSLV-C43 successfully launches HysIS and 30 customer satellites
The Indian Space Research Organisation’s (ISRO) Polar Satellite Launch Vehicle (PSLV-C43) on Thursday successfully launched 31 satellites from Satish Dhawan Space Centre (SDSC) in Sriharikota.
The PSLV-C43 lifted off...
PS4 first restart and cut off over. Second restart is close.
PS4 second restart and cut off over. Customer satellites injection commence. Injection over in a few minutes.
Congrats. Mission accomplished.
Heat Shield off. Stage 3 completed. Vehicle coasting.
PSLV can coast between Stage 3 and 4. Stage 4 normal.
HysIS separated:
There'll be two restarts of PS4 before the separation of other satellites. It'll take more than a hour from now.